Storage planning tools

Storage needs planning

Choose a focused planner for growth, creator media, computer backups, a small office, or a personal media library—or start with the complete home recommendation.

Available now

Plan capacity before it becomes a constraint.

Every result distinguishes primary usable capacity from independent backup space and uses decimal TB consistently.

Home Storage & Backup Planner

A complete first configuration for households and home offices.

Start planning

Annual Storage Growth Calculator

Forecast capacity and set a purchase horizon.

Forecast growth

Creator Media Storage Planner

Separate working media, archive, and backup capacity.

Plan media tiers

Computer Backup Storage Planner

Size an independent, versioned backup target.

Size a backup

Small Office Storage Planner

Build a vendor-neutral shared-storage requirements brief.

Build a brief

Media Library Storage Planner

Plan a personal library, copies, and an expansion trigger.

Plan a library

Bring estimates, not perfect measurements.

Use the amount of data you keep, an honest growth rate, the length of time you want the configuration to last, and an estimate of what must be recoverable. Use Decimal TB vs Binary TiB to compare labels and system displays.

For the underlying sizing method, read How Much NAS Storage Do I Need?.

Planning path

How to use the Storage needs hub

Where to start

Start with the decision that has the least reliable evidence. A household with several devices should begin with the Home Storage & Backup Planner; a known capacity with uncertain growth belongs in Annual Storage Growth Calculator. Creator Media separates fast working space, archive, and copies, while Computer Backup focuses on retained versions. Small Office adds users and network context, and Media Library uses linear annual additions.

Recommended workflow

Use a measured current-data total first, model growth second, and add independent copies third. Carry the resulting usable-capacity target into NAS configuration instead of treating raw drive labels as usable space. If upload or restore timing affects the design, continue to network performance before pricing. This order keeps capacity, protection, recovery, and transfer constraints distinct while allowing each later tool to reuse the earlier evidence.

What to prepare

Prepare folder or device used-space reports, a one-year history if available, the planning horizon, expected additions or percentage growth, retention needs, and the number of truly independent copies. Separate replaceable downloads from irreplaceable originals. Record whether inputs are GB, decimal TB, or TiB, and note the date measured; stale inventory is often a larger error than rounding.

What to do next

After capacity is credible, open the NAS Bay, Drive Count & Capacity Planner for a physical layout, the 3-2-1 Backup Plan Generator for copy topology, and the Full Storage System Budget Planner for complete acquisition and operating cost. Revisit this cluster annually or after a new camera, employee, computer, project type, or retention policy materially changes the data stream.